Projects

May 2008

After expending the sum of my technical knowledge (approximately 9.75¢) in an unsuccessful attempt to bring the old configuration into this software , this page has been completely redesigned.

The original HTML version of V8Mongrel.com had a grid that outlined every part on the car and the four stages they would undergo before the project would be completed. These stages are, Assessment, Planning, Action and Evaluation. The changeover to the WordPress software made this unnecessary, as visitors to the site can now use the categories in the right hand column to navigate through these categories. While the individual part types are no longer supported independently, I have found that the individual parts are rarely a germane level of design and work. For example, springs cannot function independently of the dampers.

The process, however, still remains. I am still looking at every part (assessment), figuring out what needs to be done (planning), putting the parts on (action) and then making sure they work as intended (evaluation). Hopefully, the category links allow for the reader to see the process in action.